Tree Protection Fencing on SA Building Sites
How to use temporary mesh fencing to keep a building site out of a tree's protection zone in South Australia, and what councils and the law say about it.

BoltHire Team
Tree protection fencing is a closed line of temporary fence around a tree on a building site, set where the project arborist marks the tree protection zone, so that machines, stockpiles and digging stay out of the roots. In South Australia it matters most when the tree is regulated or significant, because damaging the root system can itself be a tree-damaging activity. This page covers how that fence is planned, placed and kept closed. It does not size a protection zone for you. That is the arborist's job, and we say where.
Why a tree on a building site needs its own line
A site fence keeps the public out of the work. A tree protection fence keeps the work out of one part of the site. Same panels, opposite job.
The damage is usually slow and invisible: a bobcat under the canopy, bricks on the roots, a trench across the drip line.
Key facts before you draw the line
- Regulated: trunk circumference of 1 m or more, measured 1 m above ground. Significant: 2 m or more. These thresholds have applied since 16 May 2024 where the Regulated and Significant Tree Overlay applies. Check the overlay, whether the tree is individually listed, and any exemption with your council.
- Who sizes the zone: a qualified arborist, from the trunk diameter. The zone includes the structural root zone.
- What stays out: digging, trenching, stockpiles, vehicles and new sealed surfaces.
- How long: Burnside says owners and workers are responsible for protecting trees "during the entire development project".
- What we supply: 2.1 m mesh panels with one foot and clamp set per panel, bracing counted off the line, and gates where you place them.
What the law and councils say
Regulated and significant trees
The rules changed on 16 May 2024. The City of Marion's notice summarises them: "Regulated Trees are now trees with a circumference of 1m or more when measured 1m above the ground level (previously a circumference of 2m)" and "Significant Trees are now trees with a circumference of 2m or more when measured 1m above the ground level (previously 3m circumference)." It also says: "All Regulated and Significant Trees require Development Approval before removal or pruning (tree damaging activity) can be undertaken." PlanSA also recognises maintenance pruning that does not need approval, so check the proposed work with council first.
Multi-trunk trees, listed species and exemptions, such as distance from a dwelling or pool, have their own rules. PlanSA publishes the full criteria. Check the tree's status before the block is cleared.
Damage to roots counts
The City of Burnside's Trees and Development FAQs list how the Planning, Development and Infrastructure Act 2016 describes tree-damaging activity. The list ends with "Any substantial damage to the tree, including to its root system." The same FAQ warns that failing to protect a regulated or significant tree during development can lead to a fine and a criminal conviction. It also says council street trees that are not regulated are protected under the Local Government Act 1999.
On who is responsible, Burnside is direct: "The property owner and all workers on site are responsible for protecting both Council and legally protected private trees during the entire development project."
The tree protection zone and AS 4970
Burnside describes a Tree Protection Zone (TPZ) as "an area around a tree that is designated to protect its roots, trunk and overall health during construction or development activities." Its size "is determined by the tree's diameter at breast height and includes the tree's structural root zone (SRZ)."
The FAQ lists activities prohibited in the TPZ, "including, but not limited to":
- Alteration of soil levels, including excavation, cut and fill.
- Mechanical trenching for footings, fences or underground services.
- Stockpiling of building materials, equipment, rubble and tools.
- Vehicle movements, including machinery.
- Sealing surfaces with impermeable materials.
Where an Arboricultural Impact Assessment is needed, Burnside says it should include a Tree Protection Plan, "A plan to protect trees during construction (TPZ fencing, tree sensitive excavation, tree sensitive design and construction)", and should meet AS 4970-2009 Protection of trees on development sites. AS 4970:2025 is now the current edition, so ask your arborist and council which edition your conditions use. Requirements differ between councils. Ask yours what it needs with the application.
We supply and install temporary fencing to the line you give us. We do not set protection zones, and we do not say a fence meets AS 4970 or satisfies an approval. The arborist and the council decide that.

Laying out the fence
Start from the arborist's plan
Mark the TPZ edge the arborist gives you on the site plan, then draw the fence on that edge or outside it. A fence drawn by eye at the canopy edge may be wrong either way.
Make it a closed ring
A line with an open side is a line someone will reverse a ute through. Close the ring. If the zone meets a continuous boundary fence, ask the arborist whether that can count as one side. Leave out a gate unless the arborist allows access.
Keep the install itself out of the zone
Our panels stand on feet, with no digging for posts. The truck and crew still need a path to the line and somewhere to stand the panels, so show that path outside the zone. Tell us about anything underground or recently excavated near the line, because we cannot see what is under the ground.
Think about the stays
Bracing is part of the installed fence, and the stays need ground to sit on. If one side of the ring is tight against a slab or boundary, raise it before install day. Shade cloth or a banner on the ring adds wind load and therefore bracing. The temporary fence wind rating guide explains why.
Plan the crossings
A driveway or service run near a tree is an arborist decision first. If the plan calls for a matted crossing for machinery, our team can arrange ground protection mats.
Fitting it into the site fence order
Most blocks with a protected tree also need a perimeter fence. The new home build fencing page covers the outer line, and the panels are on temporary fencing hire. The tree ring is a second line inside it.
On the quote, draw the lines on the map. Metres, panels, feet and bracing update as you draw, and the installed price covers hire, delivery, installation and collection, with GST included. If the tree ring does not fit the drawing, send the arborist's plan to our team; sites a map cannot show are priced by our team. To check a panel count first, how many temporary fence panels do I need has the method.
If the TPZ edge moves after a design change, get the arborist's revised plan and any approval variation first. Then redraw the line or add panels from the order page. The updated figure shows before you confirm.
Keeping the zone closed for the whole job
The ring fails in small ways: a panel lifted out for a trencher, pavers stacked against the mesh, a delivery dropped inside because it was the only flat spot.
Our hire terms already ask you not to move the equipment without telling us, to keep the line continuous and not to stack materials against it. On a tree ring those rules protect the tree too. Tell every trade the ring is not a laydown area, walk it each week, and tell us promptly if a panel, foot or brace is damaged or moved.
FAQs
Do I need tree protection fencing on my building site?
If a regulated, significant or council street tree could be affected, your council may want to see how it will be protected, and an arborist's Tree Protection Plan can include TPZ fencing. Ask your council what it needs for your application.
What qualification should the arborist have?
Burnside's FAQ recommends a minimum Level 5 (Diploma) qualified arborist to assess tree status and development impacts. Other councils may differ, so check yours.
Is your temporary fencing AS 4970 compliant?
We do not claim that. We build our mesh fencing to AS 4687 requirements and confirm the setup on site. Whether a protection fence satisfies a tree protection plan or an approval is for your arborist and council.
Can tree protection fencing go on the footpath around a street tree?
Fencing on the footpath, verge or road reserve generally needs approval from the authority that controls that land, and that approval is yours to obtain. Council street trees are protected too, so ask council first.
How long should the tree protection fence stay up?
Until the risk to the roots is over. That is usually the end of the build, including landscaping and driveways. Choose a hire length that runs that far, and extend from the order page if the program slips.
In short
Tree protection fencing is a closed mesh ring on the arborist's line that keeps machines, stockpiles and trenches out of the root zone for the whole job. The law treats root damage seriously, so get the tree's status and the TPZ settled first. Then draw the ring and the site fence on the quote and see the installed price.