Skip to content

New Home Build Fencing

Temporary fencing for new home builds, from block fence to handover, priced online with gates and bracing. Ground protection mats arranged by our team.

A two-storey house under construction with scaffolding and orange site mesh fencing
Illustrative of a typical setup for this job — not a photo of a specific job.

A new home build is the longest single fence hire most builders place, and it is the one where the line goes up before almost anything else and comes down after almost everything. That changes what you are buying. You are not fencing a hazard for a week; you are installing a perimeter that will be walked past by the public every day for months, driven through by every delivery, and worked around by trades who have no stake in keeping it tidy.

What this job usually needs

  • Full perimeter mesh on feet, with denser bracing along the street frontage and at any free end.
  • One vehicle gate at the existing truck access, plus a pedestrian gate if the trades park elsewhere.
  • Ground protection mats under the crane or excavator crossing, and over any finished driveway or verge.

Where this job goes wrong

  • The gate fights the concrete truck

    Concrete, frames and trusses all arrive at the same spot. If the vehicle gate is not there, the line gets opened and closed by hand for months — or simply left open, which is the same failure with better paperwork.

  • The fence goes up after the hole

    The excavation is the hazard, so the trigger is the dig, not the slab. The exact timing depends on your council and your build sequence, but a fence ordered after the pool shell or the footing arrives is a fence ordered in a hurry.

Questions we get

When should the fence go up?

Before the excavation, because the hole is the hazard. The exact trigger depends on the council and your build sequence.

Do I need a vehicle gate?

Most new builds do. Put it where the concrete trucks already come in — the gate position decides whether the line stays closed.

Can it stay for the whole build?

Yes. Hire is by the week, and longer terms step down into term bands rather than the weekly rate multiplied out.

The site has a pool going in. Same fence?

No. A pool needs its own barrier inside the site fence, built to AS 1926.1 requirements, and it is time-limited.

Is there a bond for a long build?

No cash bond, however many months the fence stands. You pay the term package. A card stored with Stripe covers damaged, lost or unreturned panels and extensions you request. Ordinary wear is in the damage waiver.

Price a new home build fencing setup.

Draw the line and the installed price is on screen in minutes — any hour.

See your price