If your fence stays inside the boundary, this is mostly a safety question. The moment it steps onto the footpath, it becomes a permission question too. Here is who to ask, what they will want, and what we can and cannot do for you.

Traffic cones and a barrier closing off a city street

The line that changes everything is your boundary

Temporary fencing inside your own property is governed by whether it controls the hazard properly. Temporary fencing on the footpath, the verge or the road reserve is a different matter, because that land is not yours: you are occupying public space, and pedestrians who used it have to be given somewhere else to go. That single distinction decides whether you need an approval at all. It is worth establishing before you draw the line, not after the fence is up and someone has asked.

Who the approval actually comes from

For footpath or road-reserve occupation, the authority is normally the local council for that street. Where the road is not council-controlled — a main road or an arterial — a state road authority may be involved instead. Building and pool compliance for the site itself sits with the council or your private building surveyor, which is a separate conversation from the occupation question. One site can therefore involve two or three different approvals, each with its own timeframe.

What an application generally asks for

Applications vary, but they tend to want the same categories of information. Where: the address, and the extent of the area you want to occupy. How long: start and end dates, which is where a staged programme needs thinking through in advance. What: the barrier type — mesh fencing, hoarding, barriers — and sometimes the specification it is built to. Pedestrians: what happens to people who were using that footpath, whether that is a protected walkway, a signed diversion or a crossing arrangement. And a plan or sketch showing all of the above.

The pedestrian question is the one that gets refused

In practice, fencing applications are rarely refused because of the fence. They get refused, or sent back, because the pedestrian arrangement is inadequate — a footpath closed with no alternative, a diversion onto a road without protection, or a walkway too narrow to be usable by someone with a pram or a wheelchair. If you plan the pedestrian route first and the fence line second, most of the application answers itself.

Paving stones stacked beside a footpath during street works

Lead times and the order of operations

The common failure is sequencing: the fence is booked, the crew arrives, and the approval is still pending. Approvals take as long as they take, and they are not inside your control. The order that works is to establish whether you need occupation approval, get the pedestrian arrangement decided, lodge, and then book the fence for a date after the approval window rather than before it. If the programme cannot wait, the fallback is almost always a line that stays inside the boundary, even if that costs you working space.

What we do, and what we don’t

We supply and install the fencing. We do not lodge permit applications on your behalf, and we do not represent that a permit will be granted. What we can provide is the product-side material an application asks for: the barrier type, the setup, the standard it is built to, and the line as drawn.

If you are not sure whether you need one

Ask a specific question rather than a general one, and ask it early. "This site fronts a footpath on this street, works run for about this long, and we intend to fence to this line — do we need an occupation approval, and what do you need from us?" A specific question gets an actionable answer. A general enquiry about fencing rules usually gets a link to a page you have already read.

Before you start

  1. 1
    Draw the line both ways before applying

    Inside your boundary is usually no approval at all; on the road reserve it is a council application. Seeing both numbers first is cheaper than finding out after the application.

  2. 2
    Start the pedestrian plan early

    The refusal that actually happens is usually about pedestrians, not fencing. A usable diversion path is the part of the application that gets asked about.

  3. 3
    Sequence the approval and the install

    Lead times decide the order: approval first, then the install day. Booking the day before the approval exists is how a hire gets rebooked twice.

Where BoltHire fits

None of this changes if the fence line stays inside your boundary, which is why it is worth drawing the line both ways before you decide. Draw it on the map and you can see exactly how much working space you lose by keeping it in — and what the installed price is either way.

What the installed price includes is a separate page, and so is where the site sits. This guide does not set either number.

Guide questions

Do I need a permit for temporary fencing?

Not if the line stays inside your boundary. If it occupies the footpath or road reserve, that generally needs approval from the authority controlling that land.

Do you lodge the application for me?

No. We supply and install the fencing, and we provide the product detail an application asks for.

How long do approvals take?

It varies by authority and by how complete the application is. Lodge before you book the install date rather than after.

What if the footpath has to close?

Then the application needs a pedestrian arrangement, and that is usually the part that decides the outcome. Plan the route before the fence line.