Temporary Pool Fencing for a Fence Replacement
Replacing a pool fence or a boundary fence that forms part of the pool barrier in SA? What the regulations expect while the old fence is out.

BoltHire Team
If you are replacing a pool fence in South Australia, or a boundary fence that forms part of the pool barrier, the pool still needs a compliant barrier for every day the old fence is out. The SA pool safety regulations say so directly: while a pool fence is being maintained or repaired, the owner has to put temporary fencing in place that meets the same requirements. This article covers that replacement window for an existing pool. It does not cover new pool builds, which have their own timing rules and their own guide.
What the rules say about a pool fence that is being replaced
The rules sit in the Planning, Development and Infrastructure (Swimming Pool Safety) Regulations 2019. Three parts matter for a replacement job.
- The owner keeps the barrier working. Regulation 6(1a)(b) says the owner must ensure the pool's safety features are installed and maintained to the relevant requirements.
- Repairs do not pause that duty. Regulation 4(3) says that while a pool fence is being maintained or repaired, the owner is not treated as meeting the requirements unless temporary fencing is installed and maintained so the requirements are met for that period.
- The temporary fence has to meet the same tests. The note to regulation 4(3) lists them: minimum height, maximum gap between vertical bars or posts, child-proof locking on openings, and no foot or hand holds.
- The two-month cap is a new-build rule. Regulation 4(2) limits temporary fencing to two months after a _newly constructed_ pool is finished. The replacement case is covered by regulation 4(3) instead.
- Boundary fences have their own height. The SA Government's pool safety page says a boundary fence used as part of the barrier must be at least 1.8 metres high on the pool side, with a 900 millimetre non-climbable zone at the top inside.
- Councils enforce it. Pool safety requirements are enforced by the local council, and breaches are offences under the Act.
The rest of this article is the practical side: when the gap opens, how to plan the line, and what to sort out before the old fence comes down.
When the gap opens on a replacement job
On a new build, the barrier problem starts when the shell can hold water. On a replacement job, the pool is already full. The gap opens the moment the first old panel or sheet comes off, and it stays open until the new fence is up, the gates close and latch on their own, and nothing climbable is left against it.
That makes the order of work matter more than the length of the job:
- Temporary barrier up first. The temporary line goes in before the old fence is touched, not after.
- Old fence out. Removal, disposal and any footings.
- New fence in. Posts, panels or sheets, and gates.
- Check the new barrier. Gates self-close and self-latch, heights are right, the non-climbable zone is clear.
- Temporary barrier out last. Only once the permanent barrier does the job on its own.
A one-day removal followed by a week's wait for posts to cure is still a week with the pool exposed. Plan the temporary barrier around the whole sequence, not the day the fencer is on site.
Planning the temporary line
Close the whole pool area
The temporary barrier has to close the area around the pool, not just the side where the work is. If the old fence ran along three sides and the house wall made the fourth, the temporary line usually needs to tie into the same points so there is no way around it. Doors from the house that open into the pool area are part of the same question. If you are unsure what currently counts as part of the barrier, ask before anything comes down.
Leave room for the fencer
The new fence goes in roughly where the old one was, so the temporary line often has to sit a little inside the pool area. That gives the fencing contractor room to dig post holes, set footings and fix panels without opening the barrier to do it. A line that has to be moved every hour for access is a line that will be left open.

Plan the gate
Everyone working on the job needs a way in and out. A self-closing, self-latching gate in the temporary barrier lets them through without propping anything open. Put it where the workers actually walk, so nobody is tempted to lift a panel instead.
Keep the climbable things away
Old fence sheets, offcuts, ladders, bags of concrete and tool boxes all end up stacked somewhere. Against the outside of a temporary barrier, each one is a step. Pick a material drop zone away from the line before work starts.
When the old fence is a boundary fence
Many Adelaide pools use a side or rear boundary fence as part of the barrier. Replacing that fence is a pool job as well as a boundary job.
- The new boundary fence has to meet the boundary-fence rule above if it stays part of the barrier: 1.8 metres on the pool side, with the non-climbable zone at the top inside.
- While the old boundary fence is out, the pool is open to the neighbour's yard. The temporary barrier closes that side as well.
- Your neighbour's side of a boundary barrier can be climbable, according to the SA Government page. Your side cannot.
Talk to your neighbour before the work starts. A temporary line along a shared boundary is easier to place when both sides know it is coming.
If the old fence is asbestos sheeting
Older fibro fences may contain asbestos. SafeWork SA says a licence is required to remove more than 10 square metres of non-friable asbestos-containing material. That removal work comes with its own controls, set by the licensed removalist. The pool barrier still has to be in place while it happens, so tell both the removalist and the fence hire company about the other job before the dates are set.
How long you need the temporary barrier
Work it out from the fencer's schedule, then add a margin:
- removal day and disposal;
- footings and any curing time;
- delivery lead time for the new panels or sheets;
- gate hardware and final adjustment;
- weather, because concrete does not cure on a promise.
Our temporary pool barrier is quoted by our team as a fixed 8-week package, built to AS 1926.1 requirements, with a reminder in week 7. On a replacement job, eight weeks is usually more than enough. If the new fence is finished early, book a weekday collection. If it runs late, extend from the order page and the new off-hire date shows before you confirm. See pool fence hire for what the package includes.
Pool barrier or site fence?
They do different jobs. A pool barrier is built around the pool to keep young children out of the water. A site fence is built around a work area to keep the public out of a construction site. If the fence replacement is part of a bigger renovation, you may need both, and they are priced separately. For the site fence, you can draw the line in the quote and see the installed price. For the pool barrier, send our team the pool area and the fencer's dates.
Frequently asked questions
Can the pool stay unfenced for one day while the old fence is removed?
Regulation 4(3) does not set a minimum period before it applies. It covers the time a pool fence is being maintained or repaired, so plan the temporary barrier for the removal day as well.
Does the two-month limit on temporary pool fencing apply to a fence replacement?
The two-month limit in regulation 4(2) is written for newly constructed pools. A replacement on an existing pool falls under regulation 4(3). It requires the temporary fencing for the period of the maintenance or repair.
Who is responsible for the temporary barrier, the owner or the fencer?
The regulations put the duty to maintain the safety features on the pool owner. In practice, owners often ask the fencing contractor to arrange it. Agree in writing who books it, and who checks the gate each evening.
Do I need council approval to replace a pool fence?
That depends on the work and the property. Check with your council before the old fence comes down. Our SA pool fence regulations guide covers the barrier rules in more detail.
In short
When a pool fence or a boundary fence that forms part of the barrier comes out, the pool still needs a compliant barrier for the whole time. Put the temporary line up first, plan it around the fencer's full schedule, and take it down last. For the barrier, see pool fence hire. For the build stage of a new pool, read temporary pool fence hire while building a pool.