Temporary Pool Fence Hire While Building a Pool
Building a pool in Adelaide? Learn when you need temporary pool fence hire during the build, what makes a barrier compliant, and how to get an installed price.

BoltHire Team
Building a pool in Adelaide involves a window that catches a lot of owners and builders off guard: the stretch between when the excavation or shell first holds water and when the permanent pool fence is signed off. During that window the law still expects a safe barrier around the hazard — and that's where temporary pool fence hire comes in. This guide explains when in the build you need it, what makes a temporary barrier compliant, and how to get it priced without a phone call.
Why a temporary barrier matters during the build
A pool under construction is one of the most dangerous things on a residential block. Long before there's a filter, tiles or a permanent fence, an excavation can collect rainwater, and a shell can hold enough water to drown a small child. Young children are the entire reason pool barrier law exists, and the risk doesn't wait for the project to finish.
South Australia's pool safety rules are strict about barriers around pools and the hazards that precede them. The precise legal triggers — what counts as a pool, when the barrier obligation starts, and who signs it off — are covered in our SA pool fence regulations guide, which is the authority you should read to confirm your obligations. This article focuses on the practical build-sequence question: given those rules, when do you need a temporary barrier and what should it be?
When in the build do you need a temporary pool fence?
Think of the build as a sequence of hazard points rather than a single moment:
1. The excavation stage
As soon as the hole is dug, it becomes a hazard that can hold water after rain. On many sites this is the first point a temporary barrier is warranted, especially where children live on the property or next door, or where the site isn't otherwise secured.
2. The shell and water-test stage
Once the shell is in and holding water — whether deliberately for a water test or from rain — the drowning risk is immediate and real. A compliant barrier around the pool area is essential here if one isn't already up.
3. The gap before the permanent fence
This is the window that catches people out. The pool can be functionally finished — shell, water, coping — weeks before the permanent fence is installed, landscaped and certified. Until that permanent barrier is compliant and signed off, a temporary barrier bridges the gap. Finishing the pool is not the same as finishing the fence.
The practical takeaway: decide early whether your permanent fence goes in early or late in the program, because that single decision determines how long you need the temporary barrier. A build that leaves landscaping and the permanent fence to the end needs the temporary barrier for longer.
What makes a temporary pool barrier compliant
A temporary pool barrier isn't just any fence leaned around the hole. To do its job it has to behave like a real safety barrier:
- Height and gaps that meet the standard — tall enough and with gaps small enough that a young child can't climb over, under or through it.
- No climbable footholds — the barrier and anything near it shouldn't give a child a leg-up.
- A continuous, rigid line — braced so it can't be pushed over or pulled apart, with joins that stay closed.
- A compliant, self-closing, self-latching gate — the gate is the single most common failure point in pool safety, so access has to close and latch on its own, out of a child's reach.
- Non-climbable zone kept clear — don't stack materials, tools or formwork against the barrier where they become a step.
Because the rules are specific and the stakes are high, this is exactly the kind of barrier worth hiring as a purpose-made system rather than improvising from offcuts. Confirm the exact height, gap and gate requirements for your situation against the SA pool fence regulations guide or with your certifier.

Temporary pool fence vs builders fence
Owners often assume the site's builders fence doubles as the pool barrier. Sometimes the site perimeter does help, but they're solving different problems:
- Builders / site fencing secures the whole site from the public and theft. Its gaps, gates and layout are designed for site access, not for stopping a toddler reaching water.
- A temporary pool safety barrier is specifically about keeping a young child away from the water, with the height, gap and self-latching-gate rules that implies.
On many builds you'll have both: the site fence around the block and a dedicated temporary pool barrier around the water. Don't assume one covers the other.
Keep the barrier compliant while trades are still working
A barrier is only as good as its weakest moment. The common failures during a live build are mundane: a gate propped open for a trade, formwork stacked against the mesh, a section unclipped for access and not put back. If the pool holds water, the barrier has to be intact and the gate self-latching every time the site is unattended — not just at inspection. Brief everyone on site that the barrier isn't optional and the gate doesn't get propped.
How to hire a temporary pool fence in Adelaide
Temporary pool barriers are quoted by our team as a fixed 8-week package, built to AS 1926.1 requirements, and we confirm the setup on site. The site fence around the rest of the block you can price online: draw it and the installed price is on the screen.
- Pool barriers are on the pool fence hire page.
- Confirm your legal obligations in the SA pool fence regulations guide.
- Securing the build is on the temporary fencing hire page.
Frequently asked questions
When do I legally need a temporary pool fence during construction?
As a general rule, from the point the pool or excavation can hold water that a child could reach, until the permanent fence is compliant and signed off. The exact triggers are set by SA regulations — confirm them with the regulations guide or your certifier.
Isn't the builders fence around my site enough?
Usually not. A site fence secures the block from the public and theft, but it isn't designed with the height, gap and self-latching-gate rules that a pool safety barrier needs. Many builds need both.
What makes a temporary pool barrier non-compliant?
The usual failures are a gate that doesn't self-close and self-latch, gaps that are too large, a climbable object left against the barrier, or a section left unclipped for access. The gate is the most common failure point.
How long will I need the temporary barrier?
Until the permanent fence is installed and certified. If landscaping and the permanent fence come late in your program, plan for the temporary barrier to stay up longer — decide the sequence early.
Can I get a price without calling?
For the pool barrier, talk to our team; it is quoted as a fixed 8-week package. For the site fence, yes: draw the line and the installed price shows, any hour.
In short
Temporary pool fence hire bridges the dangerous gap between a pool that holds water and a permanent fence that's signed off. Work out when in your build the water risk begins, use a purpose-made barrier with a compliant self-latching gate, keep it intact while trades work, and confirm the rules for your situation. Our team quotes the pool barrier; the site fence you can price online.
Done reading? Put a number on it.
Draw the line and see the installed price.

