Temporary Fence Gates: Pedestrian vs Vehicle

Temporary fence gate hire for building sites. Where pedestrian and vehicle gates go, how many a site needs, and keeping them shut when nobody is there.

A closed vehicle gate in a temporary mesh fence across the driveway of a house under construction

BoltHire Team

A pedestrian gate is for people on foot. A vehicle gate is for whatever arrives on wheels: the concrete truck, the frame delivery, the bin swap. Most residential builds need one vehicle gate where the trucks already come in, plus a pedestrian gate if the trades park somewhere else. The gate is where a site fence most often stops being a closed line, so where it sits matters more than how many you order.

This page covers choosing, placing and counting gates on a temporary fence line, and how they appear on the quote. It does not print gate prices or widths. Gate prices show on your drawn line in the quote; ask our team if you need a width confirmed.

Pedestrian gate or vehicle gate: the difference

A pedestrian gate is the door in the fence. Trades, owners and, on a renovation, occupants use it. It opens and closes many times a day, so it has to be easy to shut.

A vehicle gate is the opening a delivery drives through. It is used less often, but each time it opens it leaves a wide gap. That gap is the weakest point on the line, for security and for wind.

On BoltHire's temporary fencing hire page the spec reads: pedestrian and vehicle gates, "sized to what has to get through." Choose the gate for the job it does, not for the gap that looks convenient on the plan.

Gate facts for site admins and estimators

  • Gates are their own items. They are counted separately and shown on the line before you pay.
  • Gates go where the access already is. The spec says to put them where the access actually is, so the line can be closed after every trip.
  • Gate openings load the panels beside them. The wind rating guide names gate openings, free ends and corners as the weak points. A wide vehicle gate matters most.
  • Bracing follows the gates. The quote counts bracing from the line you draw, including where the gates are. It is part of the installed fence, not an option to decline.
  • The hire terms ask you to keep gates closed when the site is unattended, and to tell us promptly if a gate is damaged or moved.

Where to put each gate

The vehicle gate goes where the trucks already turn in

On a new home build, concrete, frames and trusses all arrive at the same spot. That is usually the existing crossover. Put the vehicle gate there. If it sits anywhere else, drivers stop at the wrong place and someone unclips panels to let them in. Then the line is opened by hand for months, or left open.

Look at the crossover and the verge before you draw. Is there a tree, a pole or a stormwater pit near the kerb? A gate that cannot swing clear is a gate nobody uses.

The pedestrian gate goes on the path people already walk

People take the shortest route. If the pedestrian gate is ten metres from where trades park, within a week a panel gets moved to make a shortcut. On an occupied renovation the gate should sit on the route to the front door, the letterbox and the bins. On a new build it should face the street where utes park, not the back corner.

Keep feet and wheels apart where you can

On industrial and civil sites, separate pedestrian and vehicle gates matter more than anywhere else. Mixing them is how someone on foot ends up walking into a gap a truck just opened. Put the pedestrian gate far enough from the vehicle opening that nobody is tempted to use the truck gap as a shortcut. The industrial site fencing page covers that layout.

A pedestrian gate in a temporary mesh fence beside a wider vehicle gate on a dusty building site

How many gates does a site need?

As few as the access needs, and no more. Every gate is a place the line can be left open. Some common patterns from BoltHire's job pages:

  • New home build: one vehicle gate at the truck access, plus a pedestrian gate if needed.
  • Occupied renovation: a pedestrian gate on the path occupants and trades already use.
  • Industrial or civil site: separate pedestrian and vehicle gates.
  • School works: gates only where access is genuinely required, and they latch.
  • Wedding or private function: a pedestrian gate at each access point.

A second vehicle gate earns its place when there are two real access points. A corner block with deliveries off two streets is one example. If the second gate is only "in case", leave it off. You can redraw the line later.

Sizing a gate to what has to get through

BoltHire does not publish gate widths, so this page does not guess them. Sizing starts with your traffic. Before you draw, write down:

  1. The biggest vehicle that must enter. The concrete truck, a frame or truss delivery, an excavator on a float, a skip truck. Note whether it drives straight in or swings in from the street.
  2. The turning room inside the gate. A truck that has to turn once it is through needs more opening than one that drives straight in.
  3. What walks through, and carrying what. Wheelbarrows, sheet material and a trolley of tiles all need more room than a person.
  4. When the access changes. The excavator comes in at the start, the brick delivery later, the landscaper at the end. The gate has to suit the widest vehicle of the whole job, or be moved when the stage changes.

Tell us what has to get through when you book. If the answer changes partway through, redraw the line rather than lifting panels on site.

Keeping the gates closed and locked

A fence with an open gate is not doing its job. SafeWork SA's site security page puts it plainly: "For a building site to be considered 'secured' (defined as 'made secure' or 'fastened'), the security system must be sufficiently robust to prevent access." Whether your site must be secured is the risk call for whoever runs the work. Our construction fencing requirements guide walks through that call.

In practice, three habits keep the gates honest:

  • Closing the line is the last task of the day. Do it before the last ute leaves, not as a weekly check. Do it again before a weekend.
  • Decide who holds the key. A locked gate keeps the public out. It also keeps our crew out. Our terms count a locked gate among the things that can stop an install going ahead, and collection needs the same access as install day. Leave access for install and collection days, or tell us who to call.
  • Report a damaged gate straight away. A gate that does not latch is a gap. The hire terms ask you to tell us promptly if a panel, gate, brace or foot is damaged, missing or moved.

How gates show up on the drawn line

On BoltHire you draw the fence point by point on a map. Gates and bracing then sit on that line, and what you see is the install plan the crew works to. You see the gate positions before you pay, not after a phone call.

The gate position changes the bracing, because the panels beside a vehicle opening carry more load. It also settles arguments on install day: the gate goes where you drew it. Counting panels for the rest of the line is covered in how many temporary fence panels do I need.

If a brace ends up where a trade needs to walk, move the access, or tell us so the gate goes in the right place. A brace taken off during the day goes back on before the crew leaves. The fence cost calculator gives a rough panel count; the quote counts gates, corners and bracing together.

FAQs

Do I need a vehicle gate on a temporary fence?

Most new builds do. Any job with deliveries, a concrete pour or machinery coming onto the block needs a way in that does not mean unclipping panels. A small renovation with no vehicle access onto the lot may only need a pedestrian gate.

Can a vehicle gate double as the pedestrian gate?

It can, but it is the weaker setup. A vehicle gate is wide and heavy to swing, so people leave it open. Where foot traffic and trucks share the site, a separate pedestrian gate keeps people out of the truck gap.

Can a gate be moved partway through the job?

Yes. Redraw the line and the price and the brace count update with it. Moving a gate is fine. Leaving the old opening as a gap is not.

Are gates included in the installed price?

Gates are counted as their own items on the line, and the installed price you see covers hire, delivery, installation and collection, GST included. Draw the line with the gates where you want them to read the full figure.

In short

Put the vehicle gate where the trucks already turn in and the pedestrian gate on the path people already walk. Order as few as the access needs, size them to the biggest thing that must get through, and close the line every afternoon. Draw it on the quote and see the gates, the bracing and the installed price before you book.