Skip to content

Industrial Site Fencing

Perimeter and exclusion-zone fencing for industrial and civil sites, priced online with gates and denser bracing. Solar site cameras arranged by our team.

An industrial building facade with large ventilation units, with metal mesh fencing in the foreground
Illustrative of a typical setup for this job — not a photo of a specific job.

Industrial and civil sites change the fencing problem in two ways: scale and absence. The runs are long — hundreds of metres rather than tens — and for most of the week nobody is standing anywhere near most of the line. Both of those shift what the fence has to be good at. A residential fence has to survive people; an industrial fence has to survive wind, vehicles and being unobserved.

What this job usually needs

  • Denser bracing on long exposed runs, with extra at free ends and corners.
  • Separate pedestrian and vehicle gates, positioned so foot traffic never uses the vehicle opening.
  • Solar site cameras on the stretches not visible from the compound, with a minimum 12-week hire.

Where this job goes wrong

  • Bracing is specified like a residential run

    On a long exposed straight run the load scales with length and exposure. Denser bracing there is arithmetic, not caution — underbrace it and the first gust picks the weakest span, usually the one nobody was watching.

  • Foot traffic uses the vehicle gate

    Mixing pedestrian and vehicle openings is how someone on foot ends up in the gap a truck just opened. Separate the gates and position them so the shortcut does not exist in the first place.

Questions we get

Is this different from a residential fence?

Yes. Longer runs, more exposure and more vehicle movement mean bracing proportion and gate placement matter much more.

Can you fence an exclusion zone inside the site?

Yes. Draw the exclusion boundary and the quote prices that line, its gates and its bracing.

Can the line be extended as works progress?

Yes. Add panels from the order page at the original rate rather than re-quoting the whole perimeter.

Do cameras need power on site?

No. Solar and 4G, mounted on your fence, so they can go up with it.

How long should an industrial perimeter be booked?

Book the term you expect rather than extending a short hire. Cameras on that line have a 12-week minimum. There is no cash bond. Finish or extend from the order page, and the updated figure shows before you confirm.

Price a industrial site fencing setup.

Draw the line and the installed price is on screen in minutes — any hour.

See your price