Yes, you can move temporary fencing during a hire, add panels or extend the line. On a BoltHire order the change is made from your order page, and the new number shows before anything is booked. Added panels go on at the original rate, and the line already standing is not re-quoted. What you should not do is shift the fence yourself without telling us.

This page covers changing the fence line once it is installed: moving it, adding to it and shortening it. It does not cover extending the hire dates. That is a separate question, answered in how long to hire temporary fencing.

How a line change works on a BoltHire hire

The short version, taken from our how it works page, the fence rates page and the hire terms:

  • Changes start on the order page. Add panels or move the line from the order page. The new number shows before anything is booked.
  • Added panels are priced at the original rate. The rest of the perimeter is not re-quoted from scratch.
  • Shade cloth or a banner changes the bracing. Hanging mesh or banners changes wind loading and requires bracing we supply, so tell us before anything goes on the mesh.
  • Do not move the fence without telling us. The terms say not to move, modify or attach anything to the equipment without telling us.
  • Staged jobs can be reconfigured. On a staged demolition, tell us the staging and the setup can be reconfigured rather than re-quoted from scratch.
  • No phone queue for ordinary changes. Extending, adding panels and booking the collection all happen from the order page, with the new number shown before you confirm.

Why fence lines change

A site fence rarely stays where it was drawn on day one. The common reasons are ordinary:

  • A slab is down and the excavation is filled, so the line can come in from the boundary.
  • A neighbouring lot is now part of the job and the perimeter has to grow.
  • A concrete pour, a crane or a delivery needs a wider opening for a day or a week.
  • A demolition has reached a new stage and the hazard has moved.
  • The landscaper needs access to a side return that was closed for the frame stage.

None of these is a reason to leave the line open. A changed line that is still continuous is fine. A line that was opened "for an hour" and stayed open is the failure. Our SA pool fence regulations guide makes the same point about pool barriers: moving it is fine, leaving it open is not.

Adding panels or extending the line

Adding to the fence is the simplest change. Use the order page to add the panels, check the updated number, and confirm. Our rates page answers it directly: add them from your order page, the updated number shows before you confirm, and the existing line is not re-quoted.

The industrial site fencing page says the same for long runs that grow as works progress: add panels from the order page at the original rate rather than re-quoting the whole perimeter. That matters on a staged civil job. Stage two does not reset the price of stage one.

Two things to check before you add:

Where the new run joins the old one

A gap at a return, where the new run meets the existing line or a boundary fence, is easy to miss. Mark the join clearly when you request the change. A new run that ends a metre short of a Colorbond fence is an open site.

Whether the new run is more exposed

A longer straight run, a run on an open corner, or a run with cloth on it catches more wind than a short sheltered return. Bracing on our fences is counted off run length, exposure and anything hung on the mesh, so a longer or more exposed line can need more of it. The wind rating guide explains why.

A temporary fence line being re-set to a new corner beside a finished concrete slab

Moving the existing line

Moving the fence is a change to the equipment, so it goes through us, not through whoever happens to be on site with a free afternoon. The terms are direct: do not move, modify or attach anything to the equipment without telling us. They also say we are not responsible for equipment that has been moved, modified or loaded after we installed it.

That is not paperwork for its own sake. When a line is re-set, the feet, clamps and braces have to be re-set with it. A run that was braced for its old position is not automatically braced for its new one.

Request the move from the order page. You see the new number before anything is booked.

Braces that come off for a day

Not every change is a new line. Sometimes a brace is simply in the way of a pour. The rule in our wind guide is practical: if a brace has to come off during the day, it goes back on before the crew leaves, and the line gets a look over after any windy stretch. If the brace is in the way every day, the gate is in the wrong place. Tell us and the access can be fixed properly.

Moving onto the footpath

If the new line crosses a footpath, verge or road reserve, any council or road-authority approval for occupying that land is yours to obtain. We supply and install the fencing; we do not lodge applications. The council permits guide explains when that question comes up. Check it before you move the line outward, not after.

Making the line shorter

A line can come in as well as go out. If part of the fence is no longer needed, tell us before anyone lifts a panel; request the change from the order page or ask our team, and the figure is set out before you confirm. Where the whole fence is finished with, bring the collection forward from the order page. Hire charges stop at the collection date, subject to any minimum period shown on your order.

Do not stack spare panels in a corner of the site and forget about them. The equipment stays your responsibility until we collect it, and a panel that is not returned is charged at replacement cost.

Things that change the price and things that do not

  • Add panels to the line: added from the order page at the original rate. The existing line is not re-quoted.
  • Move the line: requested from the order page. The new number shows before anything is booked.
  • Add shade cloth or a banner: the wind load changes, so the bracing is specified with it.
  • Stage a demolition: tell us the staging and the setup can be reconfigured rather than re-quoted from scratch.
  • Finish early: collection comes forward. Charges stop at the collection date, subject to any minimum on the order.

The measurement itself is also covered. Before install, measurements from the map are confirmed on site, and within 5% the price on your order stands. Where the site measures materially longer or the setup has to change, you are told the revised price before we install.

FAQs

What happens to the old gate opening when the line moves?

It is closed as part of the change. A gate can move; the old opening cannot be left as a gap. The hire terms ask you to keep the barrier line continuous, and that applies to the new layout as much as the old one.

Can a roadworks or footpath setup move as the work advances?

Yes. Interlocking barriers and mesh runs are designed to be reconfigured as the corridor moves. Tell us the staging when you book. The roadworks and footpath page covers those setups.

Can the fence come off as soon as the demolition is finished?

Not yet. The fence comes off after the clean-up, not after the demolition. An empty flat block attracts more unauthorised entry than a half-demolished one, so keep the line closed until the site is cleared.

Is changing the line the same as extending the hire?

No. Changing the line alters the setup. Extending the hire alters the collection date. Both are done from the order page, with the new figure shown before you confirm.

In short

A fence line can move, grow or shrink during a hire. Make the change from the order page, check the new number, and tell us before anything is moved so the bracing moves with it. Starting a new site instead? Draw the line and see your installed price.