Renovation Site Fencing
Temporary fencing for renovation sites, priced online with the install day on your order and no cash bond to chase. Chutes and mats arranged by our team.

Renovation sites are small, which makes people assume the fencing question is small. It is usually the opposite. A new build has a whole block to work with; a renovation has a front setback, a driveway shared with the occupants, and a boundary that is someone else’s existing fence on both sides. The line has almost no room to move, and every metre of it is within reach of the public.
What this job usually needs
- Short mesh runs closing the works area, with the occupied part of the property left outside the line.
- A pedestrian gate on the path the occupants and trades already use.
- A rubbish chute with its base bin positioned to suit both the fence line and the kerb.
Where this job goes wrong
- The gate ends up off the path people actually walk
On an occupied reno the gate has to sit on the route the occupants already use — mail, bins, the front door. Put it anywhere else and within a week a panel has been moved to make the shortcut, and the line is no longer closed.
- The chute is booked before the fence line is fixed
The base bin needs the fence line and the kerb position to agree with it. Decide the chute first and the fence second and one of the two has to move — usually the one already installed.
Questions we get
Can I fence just part of the property?
Yes, and on an occupied renovation it is usually better. Draw the line around the works area rather than the title boundary.
Can the fence go on the footpath?
Occupying the footpath generally needs council approval and a pedestrian plan. Keeping the line inside the boundary avoids that step.
Do I need a chute for a single-storey reno?
Usually not. Chutes earn their keep from the first floor up, where carrying debris down a stair is the main injury risk.
The owners are living there. Does that change anything?
It changes where the gate goes and how the line behaves when nobody is on site. Both are worth deciding before install.
When does a renovation fence come off?
Book the collection date from the order page for the end of the build-back, or between the strip-out and the quieter phase if the line can come down. The updated figure shows before you confirm. There is no cash bond and no separate cancellation fee.
Price a renovation site fencing setup.
Draw the line and the installed price is on screen in minutes — any hour.

